Two 30 inch,concrete coated pipelines with 300 m length each were installed at Marsa Alam, Red sea for Pharaoh Gold Mines Company (PGM). The two pipelines were sea water intake lines which are to provide "El Sukari" gold mine facility with necessary water for processing, sanitary and other services, the project included:
1-Onshore construction operations
2-Shore pulling by MD 300 Crane barge
3-Diving operations
4-Onshore and Offshore survey |